FERC Order 1000 Competitively Bid Transmission Projects​

2021 – 2025 Ratepayer Savings & Benefits

FERC Order 1000 Competitively Bid Transmission Projects​​

2021 – 2025 Ratepayer Savings & Benefits

Examples of Transmission Projects that Were Competitively Bid

Includes Cost Overrun Protections & Schedule Guarantees

  • Region: PJM
  • Lowest Bid Cost ($MM): $415
  • Highest Bid Cost ($MM): $1,136
  • Cost Range ($MM Savings): $721
  • Lowest Bid Savings From Highest Bid: 63%
  • Cost Containment Offered on Winning Bid: Yes
  • Schedule Guarantee Offered on Winning Bid: No
  • Region: SPP
  • Lowest Bid Cost ($MM): $72
  • Highest Bid Cost ($MM): $84
  • Cost Range ($MM Savings): $12
  • Lowest Bid Savings From Highest Bid: 14%
  • Cost Containment Offered on Winning Bid: Yes
  • Schedule Guarantee Offered on Winning Bid: Yes
  • Region: CAISO(1)
  • Lowest Bid Cost ($MM): $256
  • Highest Bid Cost ($MM): $340
  • Cost Range ($MM Savings): $84
  • Lowest Bid Savings From Highest Bid: 25%
  • Cost Containment Offered on Winning Bid: Yes
  • Schedule Guarantee Offered on Winning Bid: Yes
*NOTE:
1) CAISO does not publish full list of all bid cost. Low bid is typically selected and CAISO cost estimate is used as high bid for reference.
2) Bids do not include any Public Policy or State Goals driven Transmission RFPs (e.g., Offshore Wind Transmission)
3) ISO-NE and NYISO have not facilitated a competitive transmission RFP in the last five years, excluding offshore wind transmission.
4) ERCOT does not facilitate competitive transmission RFPs.
5) All information contained here is based on publicly available information on each respective RTO/ISO website.

Examples of Cost Overruns of Transmission Projects that Were ‘Not’ Competitively Bid

No Cost Overrun Protections or Schedule Guarantees for Ratepayers

  • Region: PJM
  • Initial CapEx ($MM): $739
  • Latest CapEx ($MM): $1,514
  • Cost Increase %: 105%
  • Region: SPP
  • Initial CapEx ($MM): $48
  • Latest CapEx ($MM): $73
  • Cost Increase %: 52%
  • Region: SPP
  • Initial CapEx ($MM): $373
  • Latest CapEx ($MM): $463
  • Cost Increase %: 24%
*NOTE: All information contained here is based on publicly available information on each respective RTO/ISO website.